August marked the successful installation of MimariSols pilot project, which was executed on the corrugated roof-top of Abdullah Hashim Gas R&D lab. The aim was to cover the HVAC load of the building, which included 6 air conditioners: splits and cassette units. Therefore, designing and installing a 11.50kWp system MimariSol was able to satisfy the day load coverage of the HVAC system and power the R&D lab with green energy.
At MimariSol our team strives for the utmost client satisfaction which was demonstrated in our first project by adhering to the strict timelines provided by the client. The project spanned 4 days from start of installation to commissioning of the system. During which the highest standards of quality and safety were maintained, along with continuous communication with the client.
MimariSols vision is to empower residential owners with green energy and enable them security from future price hikes in electricity. Therefore, in October we took our first step in this vision by installing a 10kWp Solar PV System on the roof-top of a villa located at Az-Zahra Jeddah. For our client we were able to maximize their roof area through the employment of east-west aluminum mounting structure, which resulted in 15% of their monthly energy being produced through green technology.
Throughout the project MimariSols engineering team demonstrated extreme flexibility and professionalism, as the installation was done at times which were most suitable to the client and would cause no discomfort whatsoever. Because we at MimariSol prioritize our clients ease and peace of mind.